Please note that this article only for the installation of electrical installations in homes only and place on top of the installation / roof down.
equipment:
combination pliers
Testpen
screwdriver min
screwdriver plus
hammer
Ingredients:
NYM cable size 3 X 2.5 mm in length tailored to the needs
Insulation for electrical wiring that number is adjusted to the needs
Tedus that number is adjusted to the needs
Nail clamp number 10, number is adjusted to the needs
How to install:
When the electricity in the house is still switched on / hop on over to the (area under roof) while carrying testpen and look where the wires are positive, negative and ground, wear rubber footwear is dry in order to avoid the danger of shock stun.
Having in mind that where the positive cable, and ground negarip turn off the flow of electricity in the home by moving from a position on the MCB switch (1) to the off position (0) and then bring all the equipment and materials to the top of the house and start stringing.
Install tedus on wood plapon close to the pipe where the cord exits the positive / phase / stun from MCB, negative / neutral, grounding / grounding and outlet or switch, essentially tedus position is where we make a wired connection.
Input cable (positp / phase / foe of MCB, negative / neutral, grounding / grounding) and NYM cable into the hole and then peeled kult tedus each wire copper cable to be seen with a length of approximately 2 cm.
NYM cable connect us with cables (positive / phase / foe of MCB, negative / neutral, earthing / grounding) according to the color of each, and then close all connections with isolation and enter into tedus then install pentup tedusnya.
Expand and sort tedus installation of cables following the path by following the installation of track spikes tedus then attach the clamps on the cable and plugged into a wooden ceiling with 50cm distance between the clamps.
Insert the cable into the hole tedus, the existing wiring inside / middle tedus should be increased to facilitate work when connected to the cable outlet or switch cable.
Keep massaging until all tedus cable passes. Cut the cable at the last tedus passed.